DESCRIPTION
1. This product is a two-component product with strict requirements for liquid to powder ratio. It is strictly prohibited to mix water or add other materials. The prepared materials will be used up within half an hour.
2. After the waterproof layer has completely dried and solidified, other covering layers can be used.
3. The construction temperature and storage temperature are 5-45 ° C. During construction, the principle of "thin coating multiple times" is followed, and the coating is applied to the specified or required thickness.
4. After construction, the environment should be kept ventilated and dry to achieve good film-forming conditions. The complete film-forming and curing time of this product is 8-12 hours.
5. The closed water test can only be carried out after the waterproof layer coating has completely dried and solidified for three days. During subsequent construction, the waterproof layer should be avoided from being damaged.
6. This product is stored in a cool and dry place. The unopened product has a storage period of two years, and the production date can be found in the certificate of conformity
scope of application
*Leakage surface of fire water pool * retaining wall
*Underground wall leakage * leaking ceiling bottom
*Leakage on the outer wall of the sink or cellar * Waterproofing of kitchen and bathroom walls and floors
*Leakage on the inner wall of the elevator shaft
Base treatment
1. The base surface is clean, free of oil stains and hollowing.
2. Mix and stir the liquid and powder materials in the bucket evenly until there are no particles.
3. Use a scraper for scraping, with a thickness of not less than 2-3mm, and treat the internal and external corners with circular arcs.
4. If the leakage of the base surface is severe, a hole can be opened for water diversion before construction, and the water inlet can be sealed after the back waterproofing reaches strength.
5. Each square meter of material weighs 1.5-2KG, and the specific measurement shall be based on the actual scraping thickness.
Waterproof principle
Water seeps into the building and comes into contact with the waterproof layer on the back surface. Water pressure or salt crystals form capillary pores and gaps between the waterproof material and the base surface, often separating the waterproof layer from the base surface. Especially elastic coatings are more prone to separation, resulting in widespread detachment or water leakage. Backwater King has strong adhesion and hydrophobic function, containing active substances that crystallize again when exposed to water. It has self-healing function and maintains excellent permanent waterproofing.
precautions
1. This product is a two-component product with strict requirements for liquid to powder ratio. It is strictly prohibited to mix water or add other materials. The prepared materials will be used up within half an hour.
2. After the waterproof layer has completely dried and solidified, other covering layers can be used.
3. The construction temperature and storage temperature are 5-45 ° C. During construction, the principle of "thin coating multiple times" is followed, and the coating is applied to the specified or required thickness.
4. After construction, the environment should be kept ventilated and dry to achieve good film-forming conditions. The complete film-forming and curing time of this product is 8-12 hours.
5. The closed water test can only be carried out after the waterproof layer coating has completely dried and solidified for three days. During subsequent construction, the waterproof layer should be avoided from being damaged.
6. This product is stored in a cool and dry place. The unopened product has a storage period of two years, and the production date can be found in the certificate of conformity